艳妇乳肉豪妇荡widao,日韩 欧美 国产高清91,国产日韩在线观看视频,久久人妻无码AⅤ毛片评价,日本一区二区三区免费看

Feedback

Navigation:Home  ? News  ?  Company News

Successful commissioning: the third phase pretreatment equipment of Bangkok landfill

  • Published: 2016-11-03 13:52:00
  • Hits: 1923

The landfill gas pretreatment,which was adopt the latest manufacturing technology ,has used in the third phase project of Bangkok Thailand.Bangkok landfill gas power generation project was investmented by SIMUM POWER Co.,LTD.The designed capital of power generation is 12MW. The system including a landfill gas collection system, a landfill gas purification system and an emergency torch.Our company provided the whole pretreatment system,included the CDM measure device and carbon emission reduction recording device .Full system commissioning have been made successfully in September 12. 2016.


Tel:025-84414484 Fax:025-86647595 Address:Wenying Road No.3,Binjiang Development Zone Jiangning District,Nanjing City


      Copyright by Nanjing Carbon Recycle Biomass Energy Co.,Ltd.